Sutter Health California Pacific Medical Center

This project started out being called Cathedral Hill Hospital. It would eventually become known as Sutter Health California Pacific Medical Center, or (CPMC). It is an 11-story, 1 million-square-foot hospital with 274 acute care rooms located in San Francisco, CA.

This is a state-of-the-art hospital and medical center with advanced technological applications for climate control, indoor air quality (IAQ), access and security, sustainable irrigation and water recycling systems, and much more. This was a very intense control installation that required on-site project management, tactical and logistical installation execution, programming and commissioning assistance, air balance assistance, and final closeout.

We provided the installation and wiring of controls on the following equipment:

  • 3 chillers, 3 cooling towers
  • 13 air handlers, 35 exhaust fans
  • 4 hot water boilers, 3 steam boilers, 3 heat exchangers
  • Parking garage carbon monoxide evacuation system
  • Power monitoring on all major electrical equipment
  • 1 fuel oil system for the backup generator
  • 560 zones and 325 tracking pairs (650 terminal units)
  • 37 computer room air conditioning units
  • 949 thermostats
  • 1 rainwater recovery system
  • 17 control panels and 126 transformer panels

We provided more than 12,000 feet of conduit and over 220,000 feet of control cabling.

We installed specialty controls for:

  • 13 operating rooms
  • 3 labor and delivery rooms
  • 21 isolation rooms
  • 1 MRI room

For this project, we installed an Alerton control system for Syserco. Our teams worked very closely together to bring this project in on time and on budget. It was a successful endeavor for both parties.